3W Warsaw and Gliwice
Scope of work performed:
Installation of a support structure on the roof (RBT Solar welded east-west structure)
Installation and connection of PV modules (104 SUNPRO 480W panels)
Installation of cable routes and laying of AC/DC cabling
Installation of the HUAWEI SUN200 Inverter
Expansion of the RG switchgear and installation of protection panels
Installation of equipotential bonding and grounding










