Kłodzko Fortress Gallery
Scope of work performed:
Expansion of the system to 160kW (188 new JINKO panels) on an RBT Solar east-west welded structure
Expansion of the investor's substation,
Upgrade of DC and AC wiring,
Installation of a new Sungrow SG125CX inverter,
A telemechanics system with a “zero export” function (no energy fed back into the grid).











