HomeProjectsMPK Świdnica

MPK Świdnica

Type of installation
System Size
19 carports
Year of completion
2026
System Power
1.7 MW
Location
Świdnica, Poland
Back to the list

Photo Gallery

More photos

Scope of work performed:

A comprehensive system of 19 carports,
CFA reinforced concrete foundations for carport structures,
Installation of photovoltaic modules,
Installation of inverters and AC/DC switchgear,
Installation of cable routes and AC and DC cabling, as well as control and communication cabling,
Installation of grounding, equipotential bonding, and installation protection,
Installation of cable trays, flashings, gutters, downspouts, and safety components,
Installation of carport lighting, including controls and safety features,
Construction of foundations for energy storage facilities,
Construction of the foundation for the RGME container-type main switchgear,
Installation of cabling and foundations for vertical-axis wind turbines,
Construction of a fence around the energy storage area, including gates,
Execution of earthwork, backfilling, compaction, and surface restoration,
Conducting measurements, functional tests, technical acceptance inspections, and preparing as-built documentation.

Other Projects

MPK Świdnica
Poland, Świdnica
HILTI Wrocław
Poland, Wrocław

Request a quote

Purpose of Contact
All consents are given voluntarily. Any consent may be withdrawn at any time without any negative consequences. Withdrawal of consent does not affect the lawfulness of processing carried out prior to such withdrawal.
Please be advised that, in order to best tailor our service offering to your needs, the proposal will be presented by EPC Solar Sp. z o. o.